Prevailing Wage Rate
Skilled Crafts
Name of Union:
Painter Local 1275 HevHwy
Change # :
LCN01-2024ibLoc1275
Craft :
Painter
Effective Date :
05/08/2024
Last Posted :
05/08/2024
BHR
Fringe Benefit Payments
Irrevocable
Fund
Total
PWR
Overtime
Rate
H&W
Pension
App Tr.
Vac.
Annuity
Other
LECET
(*)
MISC
(*)
Classification
Painter Bridge Class 1
$39.26
$6.50
$8.31
$0.45
$0.00
$0.00
$0.00
$0.00
$0.00
$54.52
$74.15
Painter Bridges Class 2 Rigger, Containment Builder, Spot Blaster
$36.26
$6.50
$8.31
$0.45
$0.00
$0.00
$0.00
$0.00
$0.00
$51.52
$69.65
Painter Bridges Class 3 Equipment Operator/Field Mechanic, Grit Reclamation, Paint Mix, Traffic Control, Boat Person, Driver (0-5 Years Exp.)
$29.26
$6.50
$8.31
$0.45
$0.00
$0.00
$0.00
$0.00
$0.00
$44.52
$59.15
Painter Bridges Class 3 Equipment Operator/Field Mechanic, Grit Reclamation, Paint Mix, Trafiic Control, Boat Person, Driver (plus 5 Years Exp.)
$32.26
$6.50
$8.31
$0.45
$0.00
$0.00
$0.00
$0.00
$0.00
$47.52
$63.65
Painter Bridges Class 4 Concrete Sealing, Concrete Blasting Power Washing
$28.26
$6.50
$8.31
$0.45
$0.00
$0.00
$0.00
$0.00
$0.00
$43.52
$57.65
Painter Bridges Class 5 Quality Control, Quality Assurance, Traffic Safety Competent Person
$32.26
$6.50
$8.31
$0.45
$0.00
$0.00
$0.00
$0.00
$0.00
$47.52
$63.65
Apprentice
Percent
1st 0-1500 hrs
80.00
$31.41
$6.50
$0.77
$0.45
$0.00
$0.00
$0.00
$0.00
$0.00
$39.13
$54.83
2nd 1501-3000 hrs
85.00
$33.37
$6.50
$0.77
$0.45
$0.00
$0.00
$0.00
$0.00
$0.00
$41.09
$57.78
3rd 3001-4500 hrs
90.00
$35.33
$6.50
$0.77
$0.45
$0.00
$0.00
$0.00
$0.00
$0.00
$43.05
$60.72
4th 4501-6000 hrs
95.00
$37.30
$6.50
$0.77
$0.45
$0.00
$0.00
$0.00
$0.00
$0.00
$45.02
$63.67
Special Calculation Note :
Ratio :
Jurisdiction ( * denotes special jurisdictional note ) :
1 Journeyman to 1 Apprentice
DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, KNOX, LICKING, MADISON, MUSKINGUM, PERRY, PICKAWAY, ROSS, UNION
Special Jurisdictional Note :
Details :
Heavy Highway Class 1 are qualified painters,blasters,riggers. Class 2 Equipment Tenders /or containment Builders are hired to tend employers equipment also engage in the building & moving of containment systems. Class 3 support personnel will perform Quality control duties,clean abrasive blast materials, load and unload trucks, handle all materials, man safety boats, & handle traffic control.