Prevailing Wage Rate
Skilled Crafts
Name of Union: Labor Local 83


Change # : LCN01-2024ibLoc83

Craft : Laborer Effective Date : 06/01/2024 Last Posted : 05/29/2024
BHR
Fringe Benefit Payments
Irrevocable
Fund
Total
PWR
Overtime
Rate
H&W
Pension
App Tr.
Vac.
Annuity
Other
LECET
(*)
MISC
(*)
    Classification
Laborer Group 1
$40.97
$8.40
$4.15
$0.40
$0.00
$1.00
$0.00
$0.15
$0.14
$55.21
$75.70
Group 2
$41.22
$8.40
$4.15
$0.40
$0.00
$1.00
$0.00
$0.15
$0.14
$55.46
$76.07
Group 3
$41.37
$8.40
$4.15
$0.40
$0.00
$1.00
$0.00
$0.15
$0.14
$55.61
$76.30
Apprentice
Percent
0-1000 hrs
60.00
$24.58
$8.40
$4.15
$0.40
$0.00
$1.00
$0.00
$0.15
$0.14
$38.82
$51.11
1001-2000 hrs
70.00
$28.68
$8.40
$4.15
$0.40
$0.00
$1.00
$0.00
$0.15
$0.14
$42.92
$57.26
2001-3000 hrs
80.00
$32.78
$8.40
$4.15
$0.40
$0.00
$1.00
$0.00
$0.15
$0.14
$47.02
$63.40
3001-4000 hrs
90.00
$36.87
$8.40
$4.15
$0.40
$0.00
$1.00
$0.00
$0.15
$0.14
$51.11
$69.55
More than 4000 hrs
100.00
$40.97
$8.40
$4.15
$0.40
$0.00
$1.00
$0.00
$0.15
$0.14
$55.21
$75.70
Special Calculation Note : Other is LEAD-CAP

Ratio :Jurisdiction ( * denotes special jurisdictional note ) :
1 Journeymen to 1 Apprentice
4 Journeymen to 1 Apprentice
ADAMS, ATHENS, GALLIA, HIGHLAND, JACKSON, LAWRENCE, MEIGS, PIKE, ROSS, SCIOTO, VINTON

Special Jurisdictional Note :

Details :
Group 1
Building & Construction Laborers, Signalman, Plaster Tenders, Carpenter Tenders, Mason Tenders, Mortar Mixers, Pipe Layers, Bottom Man, Sheeting & Shoring Men, Watchmen & Waterboy.

Group 2
Air & Machine Driver Tool Operators, Hand Spikers, Chain Saws, Powered Concrete Buggies, Asphalt Rakers & Smoothers, Form Setters (Street & Highway) Burning & Cutting Torches

Group 3
Gunnite Machine Operator, Gunnite Nozzle Man, Powder Men & Blasters, Miners (Tunnel & Caisson) Muckers (Tunnel & Caisson).

All Hazardous & High Work performed in excess of 25 ft. above solid base shall pay .25 per hour above Classification.

In the erection, alteration, repair or demolition of reinforced concrete chimneys, masonry chimneys, silos, and furnaces, the following rates shall apply:

25- 100 ft. $1.00 per hour/over base rate 150-200 ft. $1.50 per hour/over base rate
100-150 ft. $1.25 per hour/over base rate 200-250 ft. $1.75 per hour/over base rate
Over 250 ft. $2.00 per hour/over base rate