Prevailing Wage Rate
Skilled Crafts
Name of Union:
Carpenter Floorlayer SW District G
Change # :
LCN01-2025ibLocSWG
Craft :
Carpenter
Effective Date :
02/19/2025
Last Posted :
02/19/2025
BHR
Fringe Benefit Payments
Irrevocable
Fund
Total
PWR
Overtime
Rate
H&W
Pension
App Tr.
Vac.
Annuity
Other
LECET
(*)
MISC
(*)
Classification
Carpenter Floorlayer
$30.96
$8.39
$6.95
$0.60
$0.00
$2.50
$0.16
$0.00
$0.00
$49.56
$65.04
Apprentice
Percent
1st 6 months
70.00
$21.67
$8.39
$2.00
$0.60
$0.00
$2.50
$0.16
$0.00
$0.00
$35.32
$46.16
2nd 6 months
70.00
$21.67
$8.39
$2.00
$0.60
$0.00
$2.50
$0.16
$0.00
$0.00
$35.32
$46.16
3rd 6 months
80.00
$24.77
$8.39
$5.56
$0.60
$0.00
$2.50
$0.16
$0.00
$0.00
$41.98
$54.36
4th 6 months
80.00
$24.77
$8.39
$5.56
$0.60
$0.00
$2.50
$0.16
$0.00
$0.00
$41.98
$54.36
5th 6 months
90.00
$27.86
$8.39
$6.26
$0.60
$0.00
$2.50
$0.16
$0.00
$0.00
$45.77
$59.71
6th 6 months
90.00
$27.86
$8.39
$6.26
$0.60
$0.00
$2.50
$0.16
$0.00
$0.00
$45.77
$59.71
7th 6 months
95.00
$29.41
$8.39
$6.60
$0.60
$0.00
$2.50
$0.16
$0.00
$0.00
$47.66
$62.37
8th 6 months
95.00
$29.41
$8.39
$6.60
$0.60
$0.00
$2.50
$0.16
$0.00
$0.00
$47.66
$62.37
Special Calculation Note :
Other: UBC National Fund and Install
Ratio :
Jurisdiction ( * denotes special jurisdictional note ) :
1 Journeymen to 1 Apprentice
BROWN, BUTLER, CHAMPAIGN, CLARK, CLERMONT, CLINTON, DARKE, GREENE, HAMILTON, LOGAN, MIAMI, MONTGOMERY, PREBLE, SHELBY, WARREN
Special Jurisdictional Note :
Details :
Scope of work shall include, but not be limited to: receiving,unloading,handling,distribution and installation of all carpeting materials,carpet padding or matting materials and all resilient materials whether for use on walls, floors,counter, sink,table and all preparation work necessary in connection therewith, including sanding work. the installation of nonstructural under-layment and the work of removing, cleaning waxing of any of the above. Carpeting shall include any floor covering composed of either natural or synthetic fibers that are made in breadths to be sewed, fastened or directly glued to floors or over cushioning sound-proofing materials.Resilient Floors shall consist of and include the laying of all special designs of wood,wood block, wood composition, cork, linoleum, asphalt, mastic, plastic, rubber tile,whether nailed or glued.